 New project-2x60t/h sub-high temperature, high-pressure boiler stoker, 2x10MW condensing turbine generator. Project was put into operation in 2009.
 
 Stocker boiler: UG-60/5.3-M, 5.3MPa, 485 ℃, Wuxi Huaguang Boiler
Turbine: N12-4.9, Qingdao Jieneng steam turbine group.
Generator: QF-12-2, Jinan power equipment factory
 